Project Overview: This project replaced the existing single-lane, northbound Wailua Cane Haul Bridge structure with a new, pre-fabricated, two-lane ACROW Bridge. The new bridge was renamed Mayor Bryan J. Baptiste Memorial Bridge and added an additional lane of traffic, as well as an adjacent multi-use bicycle/pedestrian path attached to the new bridge.
Construction Cost: $29,900,000
Construction Contractor: Unlimited Construction Services, Inc.
Client: Hawaii Department of Transportation, Highways Division